The final decision was to build the exterior wall at a height of 8 meters.
The location of the wall was set near the duty room on the right side of the base.
The planned area was about 20,000 square meters.
That is, it was approximately two hundred meters long and one hundred meters wide, covering about thirty acres.
In addition, within these thirty acres.
The area closer to the base was planned to be about twenty acres for planting and other processing.
The remaining ten acres were designated for the accommodation of extra staff.
Another Weng City was to be constructed in this location and within the Inner City.
This Weng city would be slightly larger, approximately a few thousand square meters in size, where Bai Jie's research room would be relocated.
Since only the exterior wall needed to be constructed, only approximately 400 meters of wall were required.